翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Waterford, Limerick and Western Railway : ウィキペディア英語版
Great Southern and Western Railway

The Great Southern and Western Railway (GS&WR) was an Irish gauge () railway company in Ireland from 1844 until 1924. The GS&WR grew by building lines and making a series of takeovers, until in the late 19th and early 20th centuries it was the largest of Ireland's "Big Four" railway networks. At its peak the GS&WR had an network, of which were double track.
The core of the GS&WR was the Dublin Kingsbridge – main line; Ireland's "Premier Line", and still one of her most important main line railways. The company's headquarters were at Kingsbridge station. At its greatest extent the GS&WR included, in addition to the Dublin – Cork main line, the Dublin – and – Waterford lines and numerous branch lines.
==Dublin – Cork Main Line==
William Dargan, Ireland's foremost railway contractor, built much of the GS&WR's main line and a number of its other routes.
Construction of the Dublin – Cork main line began in January 1845. The project included a branch line to , which was completed in August 1846. In July 1848 the main line reached , where it met the Waterford and Limerick Railway and thus linked Dublin and by rail.
In October 1849 the main line reached the outskirts of Cork, where the GS&WR opened a temporary terminus at Blackpool. The final of line from Blackpool to the centre of Cork includes a tunnel and was not completed for another six years. Services through the tunnel began in December 1855, running to and from a second temporary terminus beside the River Lee. Finally the present terminus in Glanmire Road opened in July 1856.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Great Southern and Western Railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.